Attention: You are using an outdated browser, device or you do not have the latest version of JavaScript downloaded and so this website may not work as expected. Please download the latest software or switch device to avoid further issues.
26 Sep 2025 | |
Outside In: Schools & Campuses |
Date: Ongoing (anticipated 2026)
A state of the art medical-education building at Penn’s New Bolton Center campus elevates the large animal veterinary facility’s capabilities. We collaborated closely with the design and ownership team to site this new building sensitively within the existing pastoral landscape.
A native grassland berm screens the building and parking lot from the adjacent road, while providing a biophilic learning environment for faculty, students, and the equine patients who visit. The building flanks an amenity courtyard that provides opportunities for outdoor education and highly requested “decompression” space.
Our design showcases the inherent beauty of working landscapes, ecologically-healthy rural planting patterns, thoughtful relationship with neighboring properties, and holistic wellness.
Team Members:
Owner: University of Pennsylvania and the School of Veterinary Medicine at New Bolton
Architect: KSS Architects
Landscape Architect: Studio Sustena
Civil Engineer: Pennoni
MEP Engineers: Trefz Engineering
Lab Specialist: Wagner Architecture
General Contractor: Gardner/Fox
OLIN, with TPL, Studio Ludo, and partners, transformed Bethune and Locke schoolyards into vibrant spaces for play, learning, art, and nature, capturing stormwater and strengthening… More...
Making Place Out of Pass Through, designed by Land Collective. More...
Tall Trees Nature Playscape by Hinge Collective at the Schuylkill Center creates an inclusive, accessible woodland playg… More...
Trust for Public Land and NV5, with the School District and Water Department, transformed 1 acre of asphalt into a green… More...
SALT turned KIPP Prep’s asphalt lot into a vibrant schoolyard that fosters joy, resilience, and activism with color, sus… More...
Scout’s Development of Former UArts Buildings on South Broad Street Will Soft Launch With Early Activations Beginning Fall 2025! More...